Re: How to prepare Bug report for every day build? Your question was not clear because after executing bulid if any defect exist we logged in bug tracking tool or spreadsheet.
In spreadsheet ,
1. Defect ID
2. Defect description
3. Summary of the bug
4. Severity
5. Priority
6. Detected by
7. Assigned to
8. Version number
9. Status
10. Detected date
11. Attachment
12. Project name
__________________ V.Vadivelan There never a wrong time to do the right thing. |